Precast Process | ||
---|---|---|
Particulars | Viraj Process (Wet Cast) | Hydraulic Process (Dry Cast) |
Surface finish | Excellent and Shining (Gloss and Mate) | Moderate and Rough Only Mate |
Surface Texture | Unlimited | limited |
Strength | Upto M50 | M50 |
Production | Customised | Mass |
Concrete Strength achieved | 1-2 days | 7 - 21 days |
Investment | Very Less | Very High |
Return to investment | Quick (Within a year) | Very Slow (Min 5-6 Year) |
Aesthatics (Looks) | Very Good | Monotonous |
Manitenance Cost | Less | High |
Product Variety | Unlimited | Limited |
Man Power | Supervisor ans Unskilled | Engineer, Supervisor, Skilled and Unskilled |
Water Consumption | Very very easy | Difficult and costly |
Shifting | Less | High |
Profitability | High | Moderate |